Views: 0 Author: Site Editor Publish Time: 2023-12-21 Origin: Site
Pulang Copper Mine
The 9.75x4.7m discharging end grating plate of Pulang Copper Mine will be installed in May 2023. The grating plate is designed with steel-rubber composite, which has the characteristics of wear resistance, long life, non-extension and non-blocking of holes, and can improve the efficiency of ore discharge. Prevent ore congestion from causing excessive wear of the liner at the discharge end.
| 202 West, North Provincial Road, Zonglou, Duji District, Huaibei City, Anhui Province |
| +86-159-5618-9999 +86-139-0561-5129 +86-152-4996-2317 |
|